![]() ![]() ![]() Post upgrade steps for 10.2.0.4 to 11.2.0.4ĭownloaded the R12.2 Software from e-deliveryĭone analysis for Upgrade Steps to R12.2 from 11.5.10.2 with 11.2.0.4 64 bit databaseĭone Basic validation after database upgrade of 11.5.10.2 Application ,Post steps and taken RMAN Backupĭone Analysis and Applied all the 24 RDBMS Patches specific to 11.2.0.4 for R12.2.0 ![]() Recovered 32bit database and migrated to 64bit using RMANĭone Analysis on OLAP Conversion from 32bit to 64bitĪpps binaries copy is done location test server – appldev /d02Īpps clone and Basic validation of 11.5.10.2 after clone.ĭatabase upgrade from 10.2.0.4 64bit to 11.2.0.4 64bitġ1.2.0.4 software only installation and apply all the RDBMS PatchesĪpply all the application interoperability Patches Oracle Database Software 10.2.0.4 64bit installationġ0.2.0.4 64bit RDBMS dbTechStack Configuration in Testplanĭone Analysis of Migration of 32bit data to 64bit Data using RMAN Initial plan and Pre-requisities steps to Upgrade ERP Totally taken 300 hrs to complete the first iteration along with the documenting the steps. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |